| 31. |
Envelope no.4 while submission of tender contains ________.
|
||||||||
|
Answer:
Option (b) |
| 32. |
Who remains present during opening of tenders technical documents?
|
||||||||
|
Answer:
Option (d) |
| 33. |
Arrange following steps of opening of tender in asscending order : a. Opening of envelope no.2 b. Opening of envelope no. 1 c. Removal of Withdrawn tenders d. Opening of envelope no. 4 e. Intimation of price bid opening date
|
||||||||
|
Answer:
Option (a) |
| 34. |
Analysing and Preparetion of comparitive statement of contractor is done in which step of tendering process?
|
||||||||
|
Answer:
Option (b) |
| 35. |
Which of the follwoing activities are done while scrunity of tender stage?
|
||||||||
|
Answer:
Option (d) |
| 36. |
Tender is usually given to ________ by preparing comparitive statement.
|
||||||||
|
Answer:
Option (b) |
| 37. |
In Central Public Works Department power of acceptance of tender by Superintending Engineer is upto Rs. ________
|
||||||||
|
Answer:
Option (c) |
| 38. |
Power of executive engineer (upgraded division) for acceptance of tender in CPWD is upto Rs. ________
|
||||||||
|
Answer:
Option (b) |
| 39. |
If the contractor fails to perform his duties during work part or entire amount of his _______ is forfeited.
|
||||||||
|
Answer:
Option (c) |
| 40. |
Usually Security Deposite is ______ % of total tender amount.
|
||||||||
|
Answer:
Option (d) |